Chengong production data analysis software V3.0 is an important tool to obtain oil and gas
                            reservoir or oil and gas well parameters through oil and gas well production dynamic
                            analysis, processing and interpretation of oil and gas well daily dynamic data response. The
                            specific analysis process is to measure wellhead pressure (or bottom hole pressure) and
                            surface production data. By analyzing the changing trend of pressure and production data,
                            the purpose of inversion of underground parameters, prediction of future production capacity
                            and understanding of formation dynamics is achieved, which provides scientific guarantee for
                            the scientific formulation of oil and gas development system.
                     
                    
                        The software is easy to operate and provides more than 90,000 kinds of oil and gas well
                            analysis models, which is suitable for the development of conventional oil and gas, dense
                            oil and gas, shale gas, coal bed methane and geothermal resources, and meets the
                            interpretation needs of exploration and development of various oil and gas reservoirs
                            domestic and abroad.
                     
                 
                
                    
                    
                        The software has been upgraded and optimized on the basis of Chen Gong production data
                            software V1.0, using new Ribbon interface design, has friendly interface and easy to
                            operate.
                     
                    
                    
                        
Data processing: including fluid type selection, basic parameter
                            input, pressure and flow data input over time, data processing and model diagnosis and other
                            functions.
                        
Traditional simulation: provides traditional
                            Arps、Fetkovich、Blasingame、A-G、NPI and Transmit analysis methods for vertical oil-gas wells
                            where flow has reached the boundary.
                        
Combination simulation: provides the material equilibrium time
                            method and the coordinate combination method based on the accumulation time, including the
                            double logarithmic curve plate simulation method and the Blasingame curve plate simulation
                            method, basically covers the production model which already has the analytical solution,
                            applies to all oil and gas wells example.
                        
Capacity prediction: according to the formation parameters
                            obtained from the simulation analysis, the following production conditions (such as constant
                            pressure production) are set, and the trends of future pressure and capacity are predicted,
                            while the auxiliary functions such as transient capacity, capacity evaluation and pressure
                            design are provided.
                        
Visual display: Based on the parameters of production data
                            analysis or well test analysis, the formation pressure distribution at different times under
                            variable production capacity can be calculated and animated with two-dimensional or
                            three-dimensional graphics, which can more intuitively describe the formation flow.
                     
                    
                    
                        According to the special properties of unconventional oil and gas reservoirs such as shale
                            gas and the development characteristics of deep resources in China, the software puts
                            forward a new method of production data analysis, and gives a method of plate simulation
                            based on accumulated production, which can realize the production data analysis under the
                            condition of variable flow and pressure of oil and gas wells; for the case of frequent
                            shut-in and open wells, it provides the function of selecting shut-in point, which greatly
                            improves the interpretation accuracy; for the case of data analysis during the fracturing
                            liquid flowback drainage process, a shale gas and water two-phase flow model is proposed. In
                            the future production and pressure prediction function, various of variable system
                            prediction methods suitable for shale gas production are provided.
                     
                    
                        
Abundant simulation methods: initiating mouse drag simulation and
                            the automatic simulation method based on big data, simple to operate, fast and accurate,
                            meanwhile also provides a common manual simulation and nonlinear regression simulation
                            method.
                        
First time proposed the simulation method which the transverse
                            coordinate is the cumulative time, which solves the problem that the transverse coordinate
                            of the material equilibrium time is not monotonous, and effectively improves the simulation
                            quality of the plate when the measured data is too chaotic.
                        
Data mutation point function: in view of the drastic data
                            fluctuation caused by frequent shut-in and open wells and changing working system, the
                            virtual equivalent time correction theory is first time created, and the function of
                            selecting mutation points is provided, which greatly improves the quality of curve and
                            historical simulation, and gives more realistic production capacity prediction results.
                        
Calculation of the proportion of adsorbed gas: real-time
                            calculation function of the proportion of adsorbed gas in shale gas production is first time
                            created, to assist in judging the production stage of shale gas well, and to help the
                            rational planning of subsequent production.
                        
Shale gas and water two-phase flow model: in view of the shale
                            gas flowback drainage stage and the large amount of liquid production in the early stage of
                            production, the first two-phase flow analysis model of shale gas and water can be put
                            forward to calculate the change of water saturation near the wellbore and scientifically
                            plan the shale gas flowback drainage and production system.
                        
Various production capacity forecasting methods: including
                            constant pressure forecasting, constant flow forecasting, constant production first then
                            constant pressure forecasting, constant pressure first then constant production forecasting,
                            pressure trend line forecasting methods, etc., which are more close to the field production
                            practice, the prediction results are more accurate, and provide theoretical basis for
                            subsequent production.